Aleithawe, I, Sinno, R R and McAnally, W H (2012) Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects. Journal of Construction Engineering and Management, 138(04), 540–4.

Ashuri, B, Kashani, H, Molenaar, K R, Lee, S and Lu, J (2012) Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options. Journal of Construction Engineering and Management, 138(04), 545–57.

Chen, Q and Jin, R (2012) Safety4Site Commitment to Enhance Jobsite Safety Management and Performance. Journal of Construction Engineering and Management, 138(04), 509–19.

Dyer, B, Goodrum, P M and Viele, K (2012) Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. Journal of Construction Engineering and Management, 138(04), 558–66.

Fortunato, B R, Hallowell, M R, Behm, M and Dewlaney, K (2012) Identification of Safety Risks for High-Performance Sustainable Construction Projects. Journal of Construction Engineering and Management, 138(04), 499–508.

Hwang, B and Ho, J W (2012) Front-End Planning Implementation in Singapore: Status, Importance, and Impact. Journal of Construction Engineering and Management, 138(04), 567–73.

Kog, Y C and Loh, P K (2012) Critical Success Factors for Different Components of Construction Projects. Journal of Construction Engineering and Management, 138(04), 520–8.

Li, X and Chen, X (2012) Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction. Journal of Construction Engineering and Management, 138(04), 574–84.

Orabi, W and El-Rayes, K (2012) Optimizing the Rehabilitation Efforts of Aging Transportation Networks. Journal of Construction Engineering and Management, 138(04), 529–39.

Rahman, M M and Kumaraswamy, M M (2012) Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Journal of Construction Engineering and Management, 138(04), 469–80.

Wambeke, B W, Liu, M and Hsiang, S M (2012) Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Journal of Construction Engineering and Management, 138(04), 491–8.

Woldesenbet, A, Jeong, & H S and Oberlender, G D (2012) Daily Work Reports–Based Production Rate Estimation for Highway Projects. Journal of Construction Engineering and Management, 138(04), 481–90.

  • Type: Journal Article
  • Keywords: Scheduling; Project management; Highways and roads; Regression analysis; Productivity; Project schedule; Contract time; Production rate; Highway Project; Daily work report; Regression analysis;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000442
  • Abstract:
    Production rate estimation of major construction activities in a project play an important role in the planning of resources, tracking project progress, and determining contract time of construction projects as these activities typically fall in the critical path of the project schedule. This paper discusses the possiblity that readily available data from highway agencies such as Daily Work Reports (DWRs), soil data, average traffic information, and weather information can be successfully used to identify and assess significant factors that must be considered in estimating the production rates of major highway activities and to develop production rate estimation models. Common production rate estimation methods such as expert opinion, engineering judgment, and production rate charts may lead to erratic production rate estimation by comparing the production rates calculated and estimated through different methods. Actual project data–based production rate estimation might be the most reliable method. An Excel-based software program was developed in this study for estimating the production rates of controlling highway construction activities when project information is given as input data.